The position of the VHF and GNSS antennas must be added to the existing antenna layout
of the vessel.
3.14 Power Supply
The NAUTICAST must be supplied from the emergency power source. A new battery
capacity calculation must be undertaken. See sample in 9.1 (Samples for battery calculation)
Following documents are needed for the installation approval of the classification
Antenna Layout (arrangement)
Battery Calculation
Connection / Block Diagram with locations
Type Approval Certificate
Y1-03-0212H
33